# Vulcore Energy: frequently asked questions Source: https://vulcore.energy/faq. 75 answers. Each answer below is the text published on that page. ## Why it matters What Vulcore is, why AI needs it, and what a Victor module means for the place it's in. ### What does Vulcore do? We build distributed AI infrastructure: a network of battery-backed AI compute sites on the spare electrical capacity commercial buildings already have. Each site is a Victor module: a battery, cooling and racks of AI servers in one box, set behind a building's meter in weeks. ### Is Vulcore an energy company or a compute company? A compute company with a battery underneath. Running AI servers is the job. The battery is what lets a module run on a building's existing power, so it goes live in weeks instead of waiting years for a new grid connection. ### Is Vulcore a modular data center company? Not quite. Like a modular data center, a Victor module is built in a factory and arrives in one piece. The difference is what it needs when it gets there. A modular data center still needs a site with new power. A Victor module brings a battery that lets it run on the spare power a building already has. Here's how it compares with the other options (https://vulcore.energy/distributed-ai-infrastructure#compare). ### Is Vulcore edge computing? Yes, in the sense that matters for AI: compute in or near the towns its users are in, instead of on a campus hundreds of miles away. Closer means faster answers and data that stays near where it came from. Vulcore's edge is the commercial buildings that have spare power, run as one network. ### Where does the power come from? From room the building already has. A commercial building's electrical service is sized for its busiest moment, and most of the time much of it goes unused. A Victor module uses that spare room. Its battery fills up when the building is quiet and carries the module when the building is busy. The building never draws more than its service was built for. That's what we mean by firming: making capacity that already exists steady enough to rely on. No bigger connection, no new transformer, no new line. ### Why can't AI companies just plug into the grid? Because the wait is measured in years. Across the U.S., more than 2,000 gigawatts of new power plants and storage are waiting to connect, and the typical project that came online in 2025 waited more than five years. Big new loads face a line of their own: in Texas, requests to connect large loads reached about 438 gigawatts by mid-2026, more than four times the state's all-time peak demand. Capacity can't be built as fast as AI is growing. ### Is AI's power demand real, or hype? Real, and the buyers are the ones saying so. Microsoft's CFO has told investors the company has been short of space and power for many quarters, its CEO says it has chips sitting in inventory that it can't plug in, and Futurum Group puts the backlog of Azure orders Microsoft can't power at about $80 billion. Nvidia says the gap between supply and demand will hold back its growth at least through early 2028. Goldman Sachs projects U.S. data center power demand to double, from 31 gigawatts in 2025 to 66 gigawatts in 2027. The clearest sign is the line to connect: far more demand is waiting than the grid can serve. ### How much spare power do commercial buildings have? A lot. By our estimate, about 460 gigawatts of electrical service sits unused behind the meters of 5.9 million U.S. commercial buildings, built up from federal building data. After screening for the right service, space, local wiring and willing owners, about 35 gigawatts is ready to use today. That's more than a third of the Texas grid's all-time peak. ### Why small sites instead of giant campuses? Because most AI work doesn't need a giant campus. Training a frontier model takes thousands of chips wired together in one building. Serving it doesn't: each copy runs on one server, and each request can go to whichever site is closest. Closer means faster answers, power that's already delivered, and data that stays in the building or town it came from. Serving is where AI is headed: McKinsey expects it to be about 60% of AI data center demand by 2030. ### Is it really no queue and no new wires? At the sites that qualify, yes. A Victor module is a regular commercial account on the building's existing service, and it never sends power back to the grid, so it gets a utility work order instead of a place in the years-long line to connect. The battery keeps the building and the module together inside the service that's already there. Qualifying is the work: the site visit checks the transformer, the wiring and the space before anything is signed. ### What happens when the power shortage eases? Prices for capacity will come down as new plants and lines get built, and we plan for that. A Victor module needs no land, no new building, no substation and no new line, so it costs less per kilowatt to deliver than a new campus, even after power catches up. And AI keeps moving closer to the people who use it, into the buildings where they live and work, long after the grid catches up. The case for a module doesn't depend on the shortage lasting. ### Why should my community care? AI is being built everywhere, and the question is how. The big campuses need new power plants, new power lines and new water supplies, and the communities around them carry those costs. A Victor module runs on electrical capacity a local building already has, on ground that's already paved, with no new wires, no water main and no diesel. It's the lightest way to bring AI to a town. ### What does my town get out of it? Local building owners earn rent on capacity that sits idle today. We use local electricians when we can. We pay property tax on our equipment, locally. And the building we partner with keeps its lights, security and other critical circuits on when the power goes out. ### Is it good or bad for the grid? It's built to help. The grid has to match supply and demand every second to hold 60 cycles, and too little demand strains it too. A Victor module's battery soaks up power when there's extra and steps off the grid when there isn't enough. It also gets more out of wires that are already built: commercial buildings use well under half of their electrical service on average, and a module puts that idle capacity to work instead of asking for new lines. When the grid goes down, the building's critical circuits stay on. ### Is it good for the environment? It uses what's already built. A Victor module sits on paved ground at a building that already has the power, so there's no new land, no new lines and no new plant. Nothing burns on site: backup comes from the battery, not a diesel generator. Water comes from a garden hose on the hottest afternoons, less than half the flow of a bathroom faucet, never from a water main. When the grid is stretched, the battery steps the module off it. And the battery is lithium iron phosphate, with no cobalt and no nickel, recycled at the end at our cost. ## In your community The neighborhood, water, power bills, safety, weather and the rules. ### Will it change the neighborhood? No. A module sits at the edge of a commercial lot that's already paved. No new building, no rezoning, no exhaust and no fuel deliveries. Most people will never notice it's there. ### Does Vulcore use water? Not the way data centers do. No cooling towers, no water main, no new water line. On the hottest summer afternoons, a Victor module sprays a light mist on its cooler from an ordinary garden hose. It uses less than half the flow of a bathroom faucet. A large data center can use up to 5 million gallons of water a day. That's more than a Victor module uses in 200 years. A garden hose, not a water main. ### Is a Vulcore module a data center? No. It's a battery and a few racks of computers in one steel box, placed at a building that already has more electricity than it uses. It draws about a tenth of a megawatt, about what a mid-size office building uses and hundreds of times less than the big campuses that need their own power plants and power lines. It needs no new power plant, no new wires, no water main and no diesel, and it pays the same electricity rates as any business. ### Do new data center rules apply to Vulcore? They're written for a different kind of project. New rules go after what makes a big campus hard on a town: a huge draw on the grid, backup generators, fuel tanks and cooling towers. They kick in at loads hundreds of times bigger than a Victor module, which draws about a tenth of a megawatt. A module has no generator, no fuel and no cooling tower, and it takes up about as much ground as a parking space to a container. To a city it's equipment on a commercial lot, like a battery cabinet or a rooftop air conditioner. The team checks the local rules for every building before a module goes in. ### Does Vulcore get tax breaks or special electricity rates? No. A module pays the same electricity rates as the building it sits next to, and we don't ask for tax breaks or incentives to put one in. ### Does a module raise anyone's electricity bill? No. A module runs on power the building's wiring can already deliver, so the utility builds nothing new and there's nothing new for anyone to pay for. It draws a steady amount day and night, and steady customers are the cheapest kind for a utility to serve, which helps hold everyone's rates down. When the grid is stretched, the battery takes over and the module all but stops drawing from the grid for a few hours. ### Who pays for the electricity? We do. We pay for all the electricity a Victor module uses, and the building's own bill doesn't go up. We don't need new power lines, so there's nothing new for your neighbors to pay for. ### Is the battery safe? Victor modules use lithium iron phosphate, the battery chemistry utilities rely on for grid storage. It's far more stable than the batteries in phones and laptops. A fire-rated wall separates the battery from the servers, gas and heat sensors are watched around the clock, vents release battery gas safely, and the module stands outdoors at the distance fire code sets from the building. An independent lab tests and certifies every module before it ships. We install to national fire code, and the local fire department reviews every site before it turns on. ### What kind of battery is it? Lithium iron phosphate, LFP for short. Lithium batteries get their names from what holds the lithium inside each cell. In a phone or most electric cars, that's a mix built on nickel and cobalt, picked because it packs the most energy into the least weight. In LFP it's iron and phosphate, two of the cheapest and most common materials there are. The trade is weight: an LFP battery is heavier for the energy it holds, which matters in a car and not in a steel box on a parking space. In return it's much harder to set on fire, because iron phosphate holds its oxygen when it gets hot instead of feeding a flame, and it can be filled and drained thousands of times before it wears out. It's also the safer battery to recycle: nothing in it is scarce or toxic, and the lithium, copper, aluminum and iron phosphate all come back out to make new ones. That's why it's the chemistry in most new grid batteries, and why we chose it. A Victor module's battery is the same kind a utility sets beside a substation, sized for one building. ### What about floods and storms? The module is built for outdoor weather, and flood is handled before a site is chosen. We screen every site against federal flood maps, pass over high-risk zones and set modules on raised pads. The battery sits in its own sealed enclosure. And when a storm takes the grid down, the battery keeps the building's critical circuits on. ### What if a car hits it? Steel posts set in concrete surround every module where vehicles can reach it, as fire code requires. And every module is insured. ### Is it loud? About as loud as the air conditioning units already on the building. ### Can the batteries be recycled? Yes. Lithium iron phosphate has no cobalt and no nickel, and recyclers recover its lithium, copper and aluminum to make new products. We pay for it. The plan for taking the battery out safely at the end is part of every site's permit, and the local fire department reviews it. ### Is this a good way to build AI? We think it's the best one on offer. AI is getting built either way; the question is what it costs everyone else. Every Vulcore site is a battery first. It runs the computers on power a building already has, so no one builds a new plant or a new line to serve it. It pays the same electricity rates as any business, with no tax breaks. When the grid is stretched, the battery steps the module off the grid for a few hours, and when the power goes out, it keeps the building's critical circuits on. It uses no water main and no diesel. And it stays in town: rent to a local building owner, property tax paid locally, local electricians, and data that stays near the people it serves. We also know who we host. Every customer is screened and held to published rules (https://vulcore.energy/rules) on what can run at our sites, and every machine stays in the United States. ### Who do I talk to? Us, directly. We're glad to meet with city staff, the fire department and neighborhood groups. Email support@vulcore.energy (mailto:support@vulcore.energy). ## For property hosts Rent, backup power, room, wiring, permits, insurance, and what happens if you sell. ### What's in it for my building? Rent on electrical capacity you already pay for and don't use, and backup power for the circuits that matter most. We finance, install, insure, operate and maintain the module, at no cost to you. You get a check every month. ### Does my building get backup power? Yes. When the grid goes down, the module keeps your building's critical circuits running on its battery: lights, security, the gate, refrigeration, the network closet. We choose those circuits with you during the site visit and wire them to switch over automatically. ### Does my building need new electrical service? No. We use capacity your building already has, and most commercial buildings have far more electrical service than they use. A short site visit confirms the fit before anything is signed. ### Does my building qualify? Start with the electrical service. Most sites that fit have 480-volt three-phase service with about 200 amps to spare, and the largest Victor needs about 250. You also need a spot at the edge of the lot and fiber at or near the property. Try the fit tool on our homepage (https://vulcore.energy/#modules), or send us your service size and a recent electric bill, and a short site visit confirms it. ### Does the module use my building's internet? No. We bring our own fiber to the module, separate from yours, and nothing we run connects to your network. If a carrier needs to build to the module, the route is agreed with you first, usually a short trench or a line on an existing pole. ### I own several buildings. Can you do all of them? Yes, under one agreement, with the same module at every site. Send the list and we screen it; the portfolio case (https://vulcore.energy/use-cases#portfolio) on our use cases page shows how it works. ### How much room does a Victor module take? From about one parking space for the smallest Victor to a 40-foot container for the largest. The larger Victors are built in shipping containers, so they arrive on an ordinary truck and set with one crane lift. We place it at the edge of the lot, out of the way of tenants and traffic. ### Which parking space does it take? One you choose. We recommend a spot at the edge of the lot, out of tenant traffic, and it earns rent every month it's there. ### What does it look like? A matte steel enclosure, about a parking space for the smallest Victor and a shipping container for the larger ones. Where a property calls for it, we screen the module or match its finish to the site. ### Who owns the equipment? We do. The module is our equipment on your property, like a generator or a battery cabinet. Not a new building, not a rezoning, not a new use of your property. ### What permits does it take? Three, all local, and we handle them. The utility sets a separate meter for the module on your existing service. The city issues an electrical permit, and the fire department reviews the site. And we check zoning so the module counts as equipment, not a new use of your property. ### What do my insurer and lender need? You're named on our insurance, and your lender gets what it needs from us before anything arrives. We insure the module and carry liability coverage, and compute partners insure their own servers. We do the paperwork. ### Will my tenants notice? Installation takes days, not months, and looks like a small electrical job. We cone off one parking row for the tie-in, block no unit or door, and schedule it with your site manager. After that, it's a locked, monitored enclosure at the edge of the lot. ### Who will be running hardware at my site? Companies running their own AI servers: serving models, rendering, simulation, fine-tuning. Every customer is screened and held to our published rules (https://vulcore.energy/rules) before any hardware arrives, and every machine stays in the United States. ### How often does someone service it, and how long does it stay? A few scheduled visits a year, like the service on your building's air conditioning, plus remote monitoring around the clock. The module is built to last 15 years and more, and it stays as long as the agreement does. ### What happens if something goes wrong with the battery? The module watches itself: heat and gas sensors around the clock, and a battery that takes itself offline at the first sign of trouble. Our monitoring team calls the fire department that reviewed the site. Your staff never respond to it; they call us. ### What happens to the battery when it wears out? It doesn't stop all at once. A battery like this gives up a little capacity each year, and every cell is watched around the clock. After a decade or so we replace battery sections in place; the module, its cooling and its controls stay. Old sections are tested, those with life left go on to lighter work, and the rest go to a licensed recycler. The cost is ours, never yours. ### What happens when the agreement ends? We take the module away at our cost and leave the space the way we found it. ### What if I sell the building? The agreement goes with the property, and what happens in a sale is written into it. Buyers see hosted equipment the way they see a cell tower lease, and we work with them directly. ### What if Vulcore isn't around in ten years? The module is our equipment on your property. The agreement names who keeps it running and who takes it away if we can't, so your lot is never left holding a box. Ask the team how that's secured. ### Does this help or hurt my appraisal? A recurring payment under a documented agreement reads to appraisers the way cell tower and billboard leases do. We provide the paperwork for your appraiser. ### Is the rent REIT-qualifying income? There's a structure for that. Ask the team, and bring your tax counsel to the conversation. ### Where are you building first? Texas, with the first sites planned for 2027. Tell us where your buildings are either way; the site list shapes where we go next. ## For compute partners Where and when, capacity, connection, control, the public sector, outages and price. ### How fast can I get power? In weeks, not years. The power is already at the building, so there's no utility queue to wait in. ### Can I deploy AI compute without waiting for a grid interconnection? Yes, at sites that qualify. A Victor module runs on a building's existing electrical service as a regular commercial account and never sends power back to the grid, so it gets a utility work order, not an interconnection study or a place in the queue. A site visit confirms the fit before anything is signed. ### Does it wait on new transformers or switchgear? Not at a site that qualifies. The module connects to the building's existing service, so there's no new utility transformer, substation or service upgrade in the way, and that's where most of the waiting is. Its own power conversion is built into the module at the factory, and the tie-in is a small electrical job. ### Where and when can I get a module? Texas first, with the first sites planned for 2027, and the earliest partners help choose where they go. Tell us how much power you need, where your users are and when. ### What do I get? Power, cooling, a battery and a locked site for your servers, in one of three sizes. A V-30 carries one air-cooled rack at 30 kilowatts on a 10-foot skid. A V-60 carries two racks at 60 kilowatts in a 20-foot container. A V-100 carries three to four racks on direct liquid cooling at 100 kilowatts in a 40-foot container. Every size has its own battery and physical security, and you can reserve one module or a megawatt across a metro. ### What's in the module when my servers arrive? Racks, power and cooling, ready to go. A V-100 ships with three to four standard 42U racks, each with its own power strips, liquid-cooling manifolds and leak detection, and the V-30 ships with one air-cooled rack. Most AI servers are NVIDIA-based and built to standard designs, so the racks go in at the factory, and we match the power and cooling fittings to your servers before the module ships. ### How do my servers connect to the internet? Over fiber from two carriers on separate routes, and either one can carry your full load alone. The network gear in the module runs on its battery, so a grid outage doesn't cut your connection at our end. Your traffic runs on its own segment, apart from the module's controls and the building's network, and never over a cellular link. ### What runs well on a Victor? Inference, rendering and video, simulation, fine-tuning, and any workload whose data has to stay in one place. Frontier model training is the one job we don't build for. Our customer rules (https://vulcore.energy/rules) list what we don't host. ### Do my GPUs perform the same at a small site? Yes. Distance costs a GPU nothing: each server does the same work it would in a giant campus. Being close helps, because every 100 kilometers between a user and a chip adds about a millisecond to each round trip, and voice assistants and AI agents make many trips per task. On the hottest afternoons, an optional cooling assist keeps your chips at full speed. ### Can I reserve a megawatt, not a module? Yes, and that's how we expect most partners to reserve capacity. A megawatt is about ten modules across a metro, sold as one service under one contract and one console in VNDX, our software platform, with your work able to move between sites. ### Who controls my hardware? You do. We operate the site: power, cooling, the battery and physical security. You operate the machine: your hardware, your software, your keys. We never touch your software, and remote access is yours alone. Your network is separate from ours: VNDX sees the power, cooling and safety systems, never your data. ### What is VNDX? VNDX (Vulcore Network Dispatch Index) is our software platform. It runs every Victor module, from the controls inside it to the consoles our partners, hosts and operators use: it holds each module inside its building's electrical limit, carries the racks on the battery when the grid dips, watches every site around the clock and keeps the record. It runs the power, never your workloads. Your servers, your software and your keys stay yours. ### Whose hardware is it? Yours. You bring the servers and insure them, set the rack layout with us during design, and upgrade on your own schedule. The module is built to outlast several generations of chips, so new servers go into the same racks, power and cooling. ### Can my company run its own models on its own hardware? Yes. Your servers, your software and your keys. Put a module behind your own fence on spare power your building already has, and no one else's workload shares it. It's on-premises AI without building a data center: your data stays where it lives, and air-gapped work that never touches the public internet fits too. ### Is there a ruggedized version for defense and federal sites? Yes, the V-100R: the ruggedized Victor, with the V-100's battery and compute in a hardened 40-foot container. It runs on grid power, tactical generators or deployable solar. Smaller V-30R and V-60R versions and an air-deployable version round out the family. The defense page (https://vulcore.energy/defense) has the details. ### Can government agencies and public institutions use Vulcore? Yes. Federal, state and local agencies, utilities, water systems, public hospitals, schools and universities can host a module on their own property or reserve capacity at a Vulcore site. Their servers stay in the United States under their own keys, every part is screened against federal foreign-entity (FEOC) restrictions, and the battery keeps critical circuits on when the grid goes down. ### Do you sell GPU time, like a cloud? No. You bring your own servers, and we power, cool, protect and house them. We don't rent out GPU hours, and we never run work on your machines. ### Is this GPU colocation? Yes. You bring your servers, and we supply power, cooling, a battery, fiber and a locked site, priced per kilowatt you reserve. The difference from a colocation building is where it sits: behind the meter of a commercial building with spare power, so it doesn't wait for a new grid connection. ### What happens if the grid goes down? Your servers keep running for hours on the module's own battery. With modules across a metro, your work can also move to another site if one goes offline, the way large clouds stay up. ### Can a module run off the grid? Yes. A Victor's power converters take more than grid power: a generator or solar can feed the module too. On its own battery, a module carries your servers for hours. With power made on site, it runs for days or weeks. Our commercial sites run on the building's service and the battery, with no generator on site, and add other sources only where a site calls for it. The V-100R (https://vulcore.energy/defense), the version for defense and federal sites, is built to run on tactical generators, vehicle power and solar. ### Will grid programs ever cut my power? No. Your servers come first, always. The battery earns from the grid only with the energy it holds beyond what your servers need, so a grid request can never take power from under your machines. ### How is it priced? One monthly rate per kilowatt you reserve, with power, cooling, the battery and the site included. Tell us how much you need and when, and we reply with a site and a rate. ## Sources Where the outside numbers above come from. - More than 2,000 gigawatts waiting to connect, and a median wait above five years for the plants finished in 2025. Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition (https://emp.lbl.gov/publications/queued-2026-edition-characteristics). - About 438 gigawatts of large-load requests in Texas by mid-2026. ERCOT, June 18, 2026 (https://www.ercot.com/news/release/06182026-puct-approves-ercots). - The Texas grid's all-time peak, 91.1 gigawatts on July 22, 2026. U.S. Energy Information Administration, Today in Energy (https://www.eia.gov/todayinenergy/detail.php?id=67906). - Microsoft short of space and power for many quarters. Microsoft, fiscal 2026 first-quarter earnings call, October 29, 2025 (https://www.microsoft.com/en-us/investor/earnings/fy-2026-q1/press-release-webcast). - Microsoft's CEO on chips in inventory it can't plug in. Bg2 Pod, November 2025, as reported by Data Center Dynamics (https://www.datacenterdynamics.com/en/news/microsoft-has-ai-gpus-sitting-in-inventory-because-it-lacks-the-power-necessary-to-install-them/). - About $80 billion of Azure orders Microsoft can't power. Futurum Group, AI Capex 2026: The $690B Infrastructure Sprint, February 12, 2026 (https://www.futurumgroup.com/insights/ai-capex-2026-the-690b-infrastructure-sprint/). An analyst's figure; Microsoft's own filings report contracted backlog, not unserved orders. - Nvidia's supply short of demand at least through early 2028. Nvidia, second-quarter fiscal 2027 results, August 26, 2026 (SEC filing); call remarks reported by Supply Chain Dive (https://www.sec.gov/Archives/edgar/data/0001045810/000104581026000073/q2fy27pr.htm). - U.S. data center power demand from 31 gigawatts in 2025 to 66 gigawatts in 2027. Goldman Sachs Research, May 20, 2026 (https://www.goldmansachs.com/insights/articles/us-data-center-power-demand-projected-to-double-by-2027). - 5.9 million U.S. commercial buildings, and the electrical service they carry. Our 460 and 35 gigawatt estimates are built on this survey. U.S. Energy Information Administration, Commercial Buildings Energy Consumption Survey (CBECS) 2018 (https://www.eia.gov/consumption/commercial/). - Inference about 60% of AI data center demand by 2030. McKinsey, The future of AI workloads, February 24, 2026 (https://www.mckinsey.com/featured-insights/charts/the-future-of-ai-workloads). - A large data center can use up to 5 million gallons of water a day. Environmental and Energy Study Institute, June 25, 2025, citing The Washington Post, April 25, 2023 (https://www.eesi.org/articles/view/data-centers-and-water-consumption).